Legal Notices

Fri
08
Oct

ISD #696 - Ely Public Schools Bond Referendum Informational Meetings

NOTICE TO THE PUBLIC<BR><BR>ISD #696 - Ely Public Schools<BR><BR>Bond Referendum Informational Meetings<BR><BR> <BR><BR>There will be the following informational <BR><BR>meetings regarding the upcoming Ely school district bond referendum on:<BR><BR> <BR><BR>Tuesday, October 12, 2010<BR><BR>6:30-8 p.m.<BR><BR>H.S. Media Center - 2nd Floor Memorial Bldg.<BR><BR> <BR><BR>Thursday, October 28, 2010<BR><BR>6:30-8 p.m.<BR><BR>H.S. Media Center - 2nd Floor Memorial Bldg.<BR><BR> <BR><BR>There will a question and answer opportunity.<BR><BR> <BR><BR>All are invited to attend.<BR><BR>

Fri
17
Sep

Ely School Board Meeting Minutes Aug. 9 and 17,2010

School Board Meeting Minutes<BR><BR>August 9, 2010<BR><BR>The regular meeting of the School Board of Independent School District No. 696 was called to order at 7:00 p.m. by Chairman Marsnik. <BR><BR>On roll call the following directors were present: Erzar, Kellerman, Marsnik, Pengal, York-Jesme. Absent: Richter. Also present: High School Principal/Director of Operations, Dr. Kimberly Belcastro; Superintendent Dr. Donald Langan; Tom Coombe, Ely Echo; Adam Masloski, Ely Timberjay.<BR><BR>Pledge of Allegiance.<BR><BR>4.0 Approval of Agenda<BR><BR>4.1 Moved by York-Jesme, seconded by Erzar, to approve the agenda as amended.

Fri
17
Sep

DESCRIPTION OF PROPOSED SCHOOL CONSTRUCTION PROJECT

DESCRIPTION OF PROPOSED SCHOOL CONSTRUCTION PROJECT<BR><BR>Ely Public Schools, ISD #696 is proposing a two question referendum for facility improvements for Ely's district facilities.<BR><BR>The district is planning a two question referendum on November 2, 2010. Question number one provides $3,885,000 for the replacement of 90+ year old steam heating system, replacement of electrical service and making security and technology improvements. Question number two provides $5,630,000 for replacement of roofs, lighting and power distribution. The projects will be financed by the sale of 20 year bonds pending voter approval on November 2, 2010. The school board believes that these projects are in the best interest of the school district.<BR><BR>If the bond referendum is successful and bonds are sold, the debt service on the bonds will be eligible for debt service equalization under Minn. Stat. &#167; 123B.53, subd.

Fri
10
Sep

ST. LOUIS COUNTY SCHOOL DISTRICT ISD 2142

ST. LOUIS COUNTY SCHOOL DISTRICT<BR><BR>INDEPENDENT SCHOOL DISTRICT 2142<BR><BR>1701 NORTH 9TH AVENUE, VIRGINIA, MN 55792<BR><BR>CALL FOR BIDS<BR><BR>PROJECT IDENTIFICATION: <BR><BR>Sealed proposals will be received for:<BR><BR>South Campus K-12<BR><BR>Bid Package 1 - Work Scope 39 and 41 Rebid<BR><BR>Bid Package 1 - Technology; South and Central Campuses<BR><BR>&#189; Mile East of County Highway 47 & 7<BR><BR>New Independence, MN<BR><BR>in accordance with Construction Documents prepared by Architectural Resources, Inc., 704 East Howard Street, Hibbing, MN 55746.<BR><BR>PROJECT DESCRIPTION: Bid packages scopes include: Work Scope 39 and 41 Rebid: Rebid of Asphalt Paving including parking lots and site roads; Rebid of Site Concrete including curb and gutter, sidewalks, and pond structures.

Fri
03
Sep

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS<BR><BR>Sealed Bids for: Sidewalk Replacement <BR><BR> Vermilion Community College <BR><BR> Ely, Minnesota <BR><BR>will be received by: Dave Marshall <BR><BR> Vermilion Community College <BR><BR> Ely, M N 55731<BR><BR>Until 2:00 PM, Iocal time, September 16, 2010, at which time the bids will be opened and publicly read aloud.<BR><BR>Project Scope: Exterior cast-in-place concrete sidewalk replacement to include two cast-in-place concrete stairs.<BR><BR>A Non-Mandatory Pre-Bid Meeting will be held at 9:00 AM, Thursday, September 9, 2010, in the Lower Conference Room.

Fri
27
Aug

ST. LOUIS COUNTY SCHOOL DISTRICT, INDEPENDENT SCHOOL DISTRICT 2142

ST. LOUIS COUNTY SCHOOL DISTRICT<BR><BR>INDEPENDENT SCHOOL DISTRICT 2142<BR><BR>1701 NORTH 9TH AVENUE, VIRGINIA, MN 55792<BR><BR>CALL FOR BIDS<BR><BR>PROJECT IDENTIFICATION: Sealed proposals will be received for:<BR><BR>Central Campus K-12<BR><BR>Bid Package 3 - Enclosure & Finishes<BR><BR>3943 Tamminen Road<BR><BR>Iron, MN 55751<BR><BR>in accordance with Construction Documents prepared by Architectural Resources, Inc., 704 East Howard Street, Hibbing, MN 55746.<BR><BR>PROJECT DESCRIPTION: Bid package scope includes exterior enclosure, HVAC, electrical, casework, interior finishes and specialties.<BR><BR>BASIS OF BIDS: Single Prime Bids will be received for labor and materials as outlined in the Bid Division Descriptions as described in Section 01 1215.<BR><BR>BID DATE AND LOCATION: Sealed bids will be received at St.

Fri
27
Aug

Public Notice: The city is seeking interested individuals to serve

Public Notice <BR><BR>The city is seeking interested individuals to serve on the following: <BR><BR>ELY CHARTER COMMISSION<BR><BR>Seeking two Qualified Voters in the City of Ely <BR><BR>One - one year term<BR><BR>One - four year term<BR><BR>Regular Meetings: held the 3rd Wednesday in odd months at 5:30 p.m. at the Joint Maintenance Facility Meeting Room<BR><BR>HERITAGE PRESERVATION COMMISSION <BR><BR>Seeking three individuals interested in preserving and promoting the city's historic resources. Must have demonstrated interest and expertise in historic preservation (please call for specific requirements).<BR><BR>Meeting time is to be determined<BR><BR>Please remit a letter of interest and qualifications to the Ely City Clerk's Office, 209 E.

Fri
13
Aug

School Board Meeting Minutes July 12 and 22, 2010

School Board Meeting Minutes<BR><BR>July 12, 2010<BR><BR>The regular meeting of the School Board<BR><BR> of Independent School District No. 696 was called to order at 7:00 p.m. by Chairman Marsnik. <BR><BR>On roll call the following directors were present: Erzar, Kellerman, Marsnik, Richter, York-Jesme. Absent: Pengal. Also present: High School Principal/Director of Operations, Dr. Kimberly Belcastro; Superintendent Dr. Donald Langan; Tom Coombe, Ely Echo; Adam Masloski, Ely Timberjay; Eli Bissonett, WELY.<BR><BR>Pledge of Allegiance.<BR><BR>4.0 Approval of Agenda<BR><BR>4.1 Moved by Kellerman, seconded by Erzar, to approve the agenda as amended.

Fri
30
Jul

Pioneer Apartments Sidewalk Replacement Ely, MN ADVERTISEMENT FOR BID

Pioneer Apartments Sidewalk Replacement<BR><BR>Ely, MN<BR><BR>ADVERTISEMENT FOR BID<BR><BR>Project: Pioneer Apartments Sidewalk Replacement<BR><BR> Ely, MN<BR><BR>Owner: HRA of Ely, MN<BR><BR> 114 North 8th Ave. East, #111<BR><BR> Ely, MN 55731<BR><BR>Architect: SJA Architects<BR><BR> 11 East Superior St. Ste 340<BR><BR> Duluth, MN 55802<BR><BR> (218)724-8578<BR><BR> (218)724-8717 FAX<BR><BR>The Owner will receive sealed bids on Work for the project described in general as follows:<BR><BR>Pioneer Apartments<BR><BR>&#149; Remove and replace existing sidewalk;<BR><BR>&#149; Related site work.<BR><BR>Bid shall be on a lump sum basis; segregated Bids will not be accepted.

Fri
30
Jul

ST. LOUIS COUNTY SCHOOL DISTRICT CALL FOR BIDS

ST. LOUIS COUNTY SCHOOL DISTRICT<BR><BR>INDEPENDENT SCHOOL DISTRICT 2142<BR><BR>1701 NORTH 9TH AVENUE, VIRGINIA, MN 55792<BR><BR>CALL FOR BIDS<BR><BR>PROJECT IDENTIFICATION: Sealed proposals will be received for:<BR><BR>Central Campus K-12<BR><BR>Bid Package 2 - Structural<BR><BR>3943 Tamminen Road<BR><BR>Iron, MN 55751<BR><BR>in accordance with Construction Documents prepared by Architectural Resources, Inc., 704 East Howard Street, Hibbing, MN 55746.<BR><BR>PROJECT DESCRIPTION: Bid package scope includes structural components for building remodel and additions from footings to joist and deck.<BR><BR>BASIS OF BIDS: Single Prime Bids will be received for labor and materials as outlined in the Bid Division Descriptions as described in Section 01 1215.<BR><BR>BID DATE AND LOCATION: Sealed bids will be received at St.

Pages

Subscribe to RSS - Legal Notices